This page pays attention to the station of Cavaglia as its being built by Vincent.
This station isn't only for use in our club layout but also for use at home
with Vincent. That gives some extra details to the electric part of this station.
|
Cavaglia is the station south of Alp Grüm.
Its situated on a plateau between 2, for the train, difficult
descends.
After Cavaglia there is a second set of hear needle turns to bring the
tracks down to the level of Poschiavo.
|
Please find a picture based report below of our model of the station of Cavaglia
with the oldest shot at the bottom.
This page is a mix of pictures from the real Cavaglia and our model layout.
You can click on the pictures for an enlargement in a new window..
Click here to advance directly to the oldest model picture.
|
First start with overhead wiring on Cavaglia
April 2014.
It's been quiet for a while around Cavaglia.
A lot has been done in the mean time around the house and on small things but now it's time for a new step, the overhead wiring.
Just as done often in Switzerland when starting a new project we also mark all spots.
This brings you a quick insight of what it's going to look like.
Using a lot of pictures we set out all spots that should hold a pole or a portal.
|
|
|
|
Continuation overhead wiring on Cavaglia
April 2014.
|
Overhead wiring on Cavaglia ready.
October 2016.
|
|
|
|
Cavaglia in color
June 2012.
Coloring the modules progresses steadily.
The rails received ballast.
Platform and the road take shape too.
Next is the railway crossing.
|
|
Cavaglia in color
Apr 2012.
|
|
Using the paper model
|
|
Station Cavaglia in the make
Aug 2010.
|
|
Station Cavaglia in the make
Aug 2010.
After first creating a paper model from the original drawings, now
work starts on making the station building in plastic.
|
Below a few shots from 2003, from a different angle, taken during a VSZ club excursion.
|
|
|
"The village"
Cavaglia, for the
power station.
|
Station Cavaglia.
|
|
Cavaglia in action
Oct 2010.
Cavaglia in our layout during Eurospoor 2010.
|
|
Cavaglia in action
Oct 2010.
Cavaglia in our layout during Eurospoor 2010.
|
|
Test of Cavaglia
11-Feb-09.
We've put the plaster land aside for a moment ad connected Cavaglia through
a 90degree turn to our layout. This gives us the opportunity to test
before we show ourselves at the event "Rail 2009".
Cavaglia now runs as its supposed to do and the addition of motors for the
turnouts are progressing well.
|
|
Cavaglia with rails
02-Mar-08
Things are progressing.
A train can drive through the station, now the separations at the
end of the modules need to be reinforced.
And then of course all the wiring.....
|
|
Cavaglia gets shape
01-Jan-08.
Vincent has been busy at home with the station where Cavaglia
serves as an example.
|
On the left hand photo, above, can you discover the hanging tree?
It hangs from the helicopter that you can see in front of the split-up in
the road.
Perhaps you can see it better on the photo underneath, here the tree
hangs in front of the station building.
|
|
|
Woodcut just next to the railway.
|
Flying wood above Cavaglia.
|
Wood loading from Val Pila, the Bernina express passes Cavaglia without stopping.
|